Weiss Climate Test Chamber 990 Liters Temperature -40°C to +180°C WK-1000/40
Item ID: 22426
Condition: Used
Stock: Only ${ $store.getters['22426/currentItemVariation'].stock.net } in stock
PAYMENT METHODS:
²
* Excl. VAT excl. Shipping
Weiss Climate Test Chamber
Here we offer you a Weiss Climate Test Chamber.
Weiss Climate Test Chamber with Humidity and Air-Cooled
(Converted to refrigerant R-452A)
Weiss Climate Test Chamber with S!MCON Control
Test chamber volume: approx. 990 liters
Test chamber dimensions: Height 950 mm Width 1100 mm Depth 950 mm
External dimensions: Height 1995 mm Width 1390 mm Depth 1855 mm
Data for temperature tests:
Temperature range: -40°C to +180°C
Temperature deviation over time in the center of the usable space: ± 0.1 to ± 0.5 K
Spatial temperature deviation: ± 0.5 to ± 2 K
Rate of temperature change
Heating: 4 K/min
Cooling: 3 K/min
Heat compensation max. 4500 W
Data for climate tests
Temperature range: +10°C to +95°C
Humidity range: 10% to 98% r.H.
Temperature deviation over time in the center of the usable space: ± 0.1 to ± 0.3 K
Spatial temperature deviation: ± 0.5 to ± 1 K
Humidity fluctuation over time in the center of the usable space: ± 1% to ± 3% r.H.
Data for operation:
Test chamber lighting Halogen bulb 24V, 50 W
Nominal voltage: 3/N/PE AC 400V ± 10% 50 Hz
Nominal current: 22 A Nominal power 11.5 KW
Refrigerant: R-452A
Weight: approx. 840 kg
Type: WK-1000/40
For you as a buyer, the following information for your safety!
The following points will be carried out in advance on our offered chambers:
1. Function check and replacement of necessary components
2. New filling with legally compliant refrigerant
3. After successful inspection, the chambers will undergo a test run monitored with calibrated devices.
Condition: used
Scope of delivery: (See image)
(Changes and errors in the technical data are reserved!)
We would be happy to answer any further questions by phone.
Switch to environmentally friendly refrigerant
The following work can be performed on climate chambers. Please contact us if you are interested.
- Extraction and proper disposal of the previous refrigerant
- Replacement of necessary components, if unavoidable
- Evacuate the circuit and refill it with R 452A, for example.
- Checking / adjusting overheating in expansion valves
- Leak test
- Test run of the system
